

The Mint
Grade A office development
We were Lead Consultant for this new build ‘’Grade A’’ Breeam Excellent office development in Leeds City Centre. This consisted of concept design through to project completion and handover.
Located near the fast-paced hub of the City, The Mint is constructed over ground and seven upper floors arranged around a covered naturally ventilated central atrium.
The Mint was constructed from high quality natural materials and the façade combines the timeless quality required of a landmark building with contemporary style.
The office space affords the benefit of column free triple aspect accommodation whilst the internal aspect overlooks the full height atrium and offers maximum flexibility for occupier fit-out in either an open plan format or as cellular offices or a combination of the two.
Energy efficiency was built into the fabric of The Mint. From innovative lighting and heating systems to improved thermal insulation of the building leading to fewer carbon emissions and reduced running costs.
Status
Complete
Contractor
GMI Construction Group PLC
Client
Deltalord Ltd
Value
£15 Million
Size
115,000 sq ft


Left: Reception area in light filled central atrium
Above: Lobby area overlooking atrium



Above: Central atrium
Right: Office space
