Kinetic 45 – Completed

Completion of three speculative Industrial Units by Wilton Developments. This 70,000+ development is an important part of Leeds Aire Valley Enterprise zone. These units are of a very high specification including office standards setting the barre in Leeds.

img_7667 img_7684 img_7676 img_7666

Units 2 & 3 external envelope complete with doors and windows installed.  Internal office constructed and slab is poured.  All internal walls erected, finishes in progress, WC’s are tiled and internal walls painted.

Unit 1 internal slab is poured.  Internal blockwork walls erected and undergoing painting.

External slabs are being poured and entrance road and kerbs being installed.  Base layer of tarmac being constructed.

BirdsEye 15082016

3D Visualisation produced by KPP Architects (3D Visualisation Department) showing how the finished development will look